430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389
  • 430389

No greenwashing, but telling a true story about sustainability! This Impact 300D RPET rolltop backpack is made with AWARE tracer. With AWARE, the use of genuine recycled fabric materials and water reduction impact claims are guaranteed, by using the AWARE disruptive physical tracer and blockchain technology. Save water and use genuine recycled fabrics. With the focus on water 2% of proceeds of each Impact product sold will be donated to Water.org. Keep it simple and stylish with this rolltop backpack. A perfect size for all your essentials. This backpack has reused 11,6 500ml PETbottles and saved 6,92 litres of water. Water savings are based on figures when compared to conventional fibre. This calculated indication is based on reliable LCA data as published by Textile Exchange in their Material Snapshots 2016.
Brand: XD Collection.
Material: Recycled polyethylene terephthalate.

Price breaks and print colour options

Quantity 1 100 250 500 1000
Transfer 1 Colour £14.63 £13.56 £12.91 £12.36
Transfer 2 Colour £15.34 £14.09 £13.31 £12.72
Transfer 3 Colour £16.06 £14.61 £13.78 £13.10
Transfer 4 Colour £16.72 £15.08 £14.19 £13.48
Transfer Origination per Colour 59.5 57.46 55.76 54.74
Quantity 1 100 250 500 1000
Digital Transfer Full Colour £16.37 £15.00 £13.59 £12.89
Digital Transfer Origination 0 0 0 0
Quantity 1 100 250 500 1000
Embroidery Running Charge £22.73 £20.92 £19.49 £18.49
1 Colour Print £12.71 £11.98 £11.46 £11.00
Embroidery Origination 75.25 72.67 70.52 69.23

Unless stated, prices are exclusive of origination, carriage and VAT

430389 XD Collection Impact AWARE RPET lightweight rolltop backpack
FROM £11.00

Loading...

Loading...



Lead time

12 working days